See first hand some of the plants that have helped Turkey become one of the fastest growing geothermal markets. With a jump from 30 MW of installed capacity in 2008 to today around 650 MW, no country has seen a faster growth.

So we are thrilled to offer participants of the IGC Turkey, a field trip to several geothermal power plants in the region around Izmir.

The field trip is organized by Ormat Technologies, that has supplied turbines to the plants we are going to visit.

Date: 8 June 2016 (the day after the conference)

8:30 – Start of the Field trip from the Swissôtel Büyük Efes İzmir

  • Gürmat Efeler Geothermal Power Plant,
  • Menderes Geothermal – Mege DORA Geothermal Power Plants
  • Gumuskoy Geothermal Power Plant

19:00 Expected return

Make sure to register at: http://igc-turkey.com/#registration

Registration cost: EUR 60

    Your email address will not be published. Required fields are marked *

    Name *
    Email *
    Website